I ordered many parts to the french SM Club, like valves, timing chains and engine gasket set. I will be able to start working on the engine. Anyway, I will probably give the engine to a professional to install and adjust the valves and chains.
I start by cleaning everything, then I send parts to zinc plating (mainly bolts and nuts) and as soon I will receive the required parts, I will organize the reassembling phase with a professional.