SM: Arrival of the new body

SM: Arrival of the new body

An important step is done, the body arrives in Montreal. It’s now in my garage. This restoration is supposed to be now in the reassembling phase. I say “supposed” because I still have a lot of work to do on parts to reassemble. sm_221Here is the...
SM: Final preparation of the body for transportation

SM: Final preparation of the body for transportation

The body is waiting for a container. It’s brought to a shipping company in Marseille. Again a few waiting days, the container should be in Montreal on March 1st. sm_217Here she is, in Marseille, delivered by my brother. Thanks Laurent! sm_218Huge protection work...
SM: Body preparation for transportation

SM: Body preparation for transportation

When the body shop completes its work, the body is brought back to my father’s home. It will stay here to wait for its shipping over the Atlantic ocean. Front and rear half axles still have to be back to obtain a rolling body. My father works on these half axles...
SM: Painting of parts

SM: Painting of parts

By the end of 2005, after months of cleaning, brushing and sandblasting many parts, I finally begin painting. sm_197After preparation, I begin by two coats of primer sm_198I store parts after primer. There are multiple primer colors but that’s not my decision,...
SM: Engine and gearbox cleaning, continued

SM: Engine and gearbox cleaning, continued

After having done most of the cleaning work on the gearbox, I go ahead by reassembling brake discs and calipers. sm_189To put back the brake discs (new), I borrowed a comparator to measure the rotation defect… sm_190… it’s ok, the rotation defect is...
SM: Rebuilding hydraulic parts

SM: Rebuilding hydraulic parts

By September 2005, I start working on the hydraulic devices. I start with the clutch cylinder and the front brake calipers: sm_203The clutch cylinder is not difficult to disassemble… sm_204… but removing the inner gasket is a nightmare, I had to use...